FINALTERM  EXAMINATION
Spring 2010
CS605- Software EngineeringII (Session - 4)
Time: 90 min
Marks: 60

Student Info
 StudentID:
 
 Center:
 
 ExamDate:
 

Question No: 1    ( Marks: 1 )    - Please choose one
 In order to measure the design quality, if the frequency of ripple defects is too large, then it means that there is tight coupling and hence the

       ► design is maintainable
       ► design is not maintainable

       ► design has  completed

       ► none of the given

   
Question No: 2    ( Marks: 1 )    - Please choose one
 We can include following type of data in the database for creating matrix aganst each project except

       ► name of project

       ► size of project

       ► company’s CEO name

       ► cost of project

   
Question No: 3    ( Marks: 1 )    - Please choose one
 The only reason for an estimate to be unreliable is lack of experience related to the application on the part of the estimator.

       ► true
       ► false
   
Question No: 4    ( Marks: 1 )    - Please choose one
 A consideration of software scope must include an evaluation of all external interfaces.

       ► true
       ► false
  
Question No: 5    ( Marks: 1 )    - Please choose one
 If an error related to requirements is identified in testing phase, so this error will be considered as an error in  ___________ phase.

       ► Design

       ► Code

       ► Requirement

       ► Testing

   
Question No: 6    ( Marks: 1 )    - Please choose one
 Usually the performance of the organization change over-night.

       ► True

       ► False

   
Question No: 7    ( Marks: 1 )    - Please choose one
 Quality is the compliance of software to implicit and explicit quality factors. Identify the explicit requirement from the following:

       ► Maintainability

       ► Compliance with CMMI

       ► Ease of use

       ► Efficiency

 
Question No: 8    ( Marks: 1 )    - Please choose one
 Following are the benefits of conducting review except


       ► Help in finding the size of the project

       ► Helps in verifying the quality of product

       ► Help in identifying where improvement is required.
       ► Helps in identifying the bugs in the work product

   
Question No: 9    ( Marks: 1 )    - Please choose one
 Mean Time To Repair (MTTR) is the

       ► Time when system remained unable for usage

       ► Time taken to fix the error

       ► Time taken to repair the software

       ► All of the given options are correct.


Question No: 10    ( Marks: 1 )    - Please choose one
 Reliability and Safety are same concepts with respect to software quality

       ► True
       ► False
   
Question No: 11    ( Marks: 1 )    - Please choose one
 SCM is the requirement of the ________ level(s) of CMM

       ► First

       ► Second and later

       ► Third and later

       ► Only Second

   
Question No: 12    ( Marks: 1 )    - Please choose one
 We can include following items during configuration item identification:

       ► User Manuals and Documentations

       ► Source Code

       ► Software Requirement Specifications

       ► All of the given choices are correct


Question No: 13    ( Marks: 1 )    - Please choose one
 If a new version of a product is released by fixing the bugs in the previous release then it is termed as _________________
       ► Product Update

       ► Product Upgrade

       ► Defect Removal


       ► Product Performance
   
Question No: 14    ( Marks: 1 )    - Please choose one
 Every node signifies ___________ version of a release

       ► one

       ► two

       ► three

       ► four


Question No: 15    ( Marks: 1 )    - Please choose one
 The Change Control Authority does not have the rights to permit to bring the change in the software
       ► True

       ► False

   
Question No: 16    ( Marks: 1 )    - Please choose one
 Check in and Check out is actually one and the same process with two different names



       ► True
       ► False
 
Question No: 17    ( Marks: 1 )    - Please choose one
 There could be multiple GUIs to satisfy one requirement

       ► True

       ► False


   
Question No: 18    ( Marks: 1 )    - Please choose one
 _____________ is the process of Design recovery. At this stage the documentation of the overall functionality is created.


       ► Database Engineering
       ► Reverse Engineering


       ► Refactoring
       ► Forward Engineering
   
Question No: 19    ( Marks: 1 )    - Please choose one
 In code restructuring, we do not change the functionality of the code


       ► True

       ► False

   
Question No: 20    ( Marks: 1 )    - Please choose one
 In ______________, new user and technology requirement can also be integrated into the re-engineering effort.


       ► Backward re-engineering

       ► Forward re-engineering

       ► Business Engineering

       ► Business Process Engineering


Question No: 21    ( Marks: 1 )    - Please choose one
 A _____________process is “a set of logically related tasks performed to achieve a defined business outcome”.

       ► Business

       ► Software

       ► CMM

       ► ISO

   
Question No: 22    ( Marks: 1 )    - Please choose one
 Software refactoring is a process in which


       ► External behavior of the system does not change

       ► Internal behavior of the system does not change

       ► Design of the software changes

       ► Architecture of the software changes


Question No: 23    ( Marks: 1 )    - Please choose one
 The formal methods model of software development makes use of mathematical methods to


       ► define the specification for computer-based systems
       ► all of the given

       ► develop defect free computer-based systems

       ► verify the correctness of computer-based systems
   
Question No: 24    ( Marks: 1 )    - Please choose one
 Which one of the following describes the data and control to be processed, function, performance, constraints, interfaces, and reliability?


       ► Product Quality

       ► Software scope estimation

       ► Resources requirements

       ► Time requirements

   
Question No: 25    ( Marks: 1 )    - Please choose one
 Which one of the following describes the data and control to be processed, function, performance, constraints, interfaces, and reliability?


       ► Resources requirements

       ► Software scope estimation

       ► Time requirements

       ► Product Quality


Question No: 26    ( Marks: 1 )    - Please choose one
 The software plan is not a static document, it is frequently adjusted to make the project appear on track to meet all deadlines and quality targets.
       ► True
       ► False
   
Question No: 27    ( Marks: 1 )    - Please choose one
 The projects are classified into following categories except

       ► New application development

       ► Reengineering projects

       ► Concept development projects

       ► Marketing Development Projects

   
Question No: 28    ( Marks: 1 )    - Please choose one
 The processes at ----------- is focus on continually improving process performance through both incremental and innovative technological changes/improvements.



       ► Level 5
       ► Level 1
       ► Level 4
       ► Level 3
   
Question No: 29    ( Marks: 1 )    - Please choose one
 Quantitative process-improvement objectives for the organization are established, continually revised to reflect changing business objectives at -------------.


       ► Level 3
       ► Level 2
       ► Level 5
       ► Level 1
   
Question No: 30    ( Marks: 1 )    - Please choose one
 Reliability of a software is a

       ► functional requirement
       ► non-functional requirement
       ► Design Requirement
       ► None of the given
   
Question No: 31    ( Marks: 2 )
 What issues must be included in the review list?

   
Question No: 32    ( Marks: 2 )
 What is meant by requirement management?

Requirement Management is defined as a systematic approach to eliciting, organizing, and documenting the requirements of the system, and a process that establishes and maintains agreement between the customer and the project team on the changing requirements of the system.


   
Question No: 33    ( Marks: 2 )
 Give any two advantages of Software CMM?

   
Question No: 34    ( Marks: 2 )
 How can we implemente metrics in small organizations ?

   
Question No: 35    ( Marks: 3 )
 Give in brief any three factors related with operation?

   
Question No: 36    ( Marks: 3 )
 Discuss the hazards those are associated with a computer-based cruise control for an automobile?

   
Question No: 37    ( Marks: 3 )
 What would you understand by the conventional numbering of the product release?

   
Question No: 38    ( Marks: 3 )
 Write down the levels of Capability Maturity Model (starting from 0-5)?


   
Question No: 39    ( Marks: 5 )
 What are the risks associated in the migration of a Legacy system to a new system?

   
Question No: 40    ( Marks: 5 )
 How Duplicate Code can cause problem in the maintenance of a program? Explain briefly.